Work starts at £8.5m Bilbao bunker which will fuel Brittany Ferries’ huge new gas-driven ships

Sign up to FREE email alerts from BusinessLive – South West – your daily regional round-up of latest headlines, comment and analysis Invalid EmailSomething went wrong, please try again later.SubscribeWe use your sign-up to provide content in ways you’ve consented to and to improve our understanding of you. This may include adverts from us and 3rd parties based on our understanding. You can unsubscribe at any time.More infoThank you for subscribingWe have more newslettersShow meSee ourprivacy notice

Construction has started on an £8.5m bunker at a Spanish port which will allow Brittany Ferries to fuel its new liquid gas-powered super vessel.

Fuel giant Repsol has commenced work on the LNG (liquified natural gas) facilities in Bilbao, which will pave the way for the arrival of Brittany Ferries’ first LNG powered-ship Salamanca.

Work on the bunker terminal will be completed in the first half of 2022, coinciding with the ship’s arrival. Salamanca will serve UK-Spain routes, sailing from Plymouth and Portsmouth, and will be joined by a second LNG-powered vessel called Santoña, arriving in 2023.

Brittany Ferries in the news Five-year recovery plan ‘Avalanche’ of bookings ‘Seagliders’ plan Hybrid ships

Salamanca will weigh-in at more than 42,000 gross tonnes. That means she will be one of the largest ships ever to serve the company, and at 215 metres long she will be joint-longest. A separate LNG bunker will be constructed by Repsol in Santander and preparatory work is already taking place.

Construction of the LNG bunker terminal in Bilbao represents an important milestone on Brittany Ferries’ journey towards fleet renewal and energy transition, the company said. It also reaffirms the long-term partnership between the French ferry firm, which has its UK HQ in Plymouth, and fuel supplier Repsol.

“This is welcome news and I applaud Repsol and our port partners in Bilbao for driving this forward,” said Christophe Mathieu, Brittany Ferries chief executive. “The move to cleaner, green fuels relies on an integrated approach that connects vehicles with fuel suppliers and other important partners like ports. We look forward to the completion of works in the months to come and to the arrival of our first LNG-powered ship.”

Bilbao ferry terminal, in Spain Construction under way at the LNG bunker facility at Bilbao, in Spain, which will fuel Brittany Ferries’ new vessels Brittany Ferries’ newest vessel Salamanca

The Bilbao terminal will have a cryogenic tank with a storage capacity of 1,000 cubic metres, which permits the natural gas to be kept in a liquid state at -160C.

The flexible design of the terminal will allow it to service different vessels in the future, representing an important decarbonisation opportunity for port operations.

This project involves an investment of more than 10million euros (£8.5m) by Repsol. The Port Authority of Santander has already begun work on the second facility, on the quay where the bunker station will be located. Both Spanish terminals are to be co-financed by the European Commission through the CEF- Connecting Europe Facilities Programme.

LNG is a fuel which almost eliminates emissions of air quality pollutants such as SOx, and soot particulates. It also significantly cuts NOx emissions while offering clear reductions in carbon dioxide emissions when compared with standard marine fuels.

How to contact William Telford and Business Live

Business Live’s South West Business Reporter is William Telford. William has more than a decade’s experience reporting on the business scene in Plymouth and the South West. He is based in Plymouth but covers the entire region.

To contact William: Email: [email protected] – Phone: 01752 293116 – Mob: 07584 594052 – Twitter: @WTelfordHerald – LinkedIn: http://www.linkedin.com – Facebook: http://www.facebook.com/william.telford.5473

Stay in touch: BusinessLive newsletters have been re-designed to make them even better. We send morning bulletins straight to your inbox on the latest news, views and opinion in the South West. Get our breaking news alerts and weekly sector reviews too. Sign up now – it’s free and it only takes a minute. To sign up for Business Live’s daily newsletters click here

And visit the Business Live South West LinkedIn page here

Brittany Ferries said it sees LNG as the best interim energy solution, on the road to future zero-emissions fuels such as ammonia, hydrogen and biofuels. Ships such as Salamanca and Santoña will help Brittany Ferries reduce its carbon footprint as it moves towards a 2050 deadline set by the International Maritime Organisation.

In addition to Salamanca and Santoña, the company has just announced the order of two further vessels. These will be LNG-hybrid ships, replacing two of the oldest vessels in the Brittany Ferries fleet. They will operate on the Channel connecting France with the UK arriving in 2024 and 2025. As well as operating in battery-only mode when manoeuvring in port, the LNG-hybrids will be configured to plug-in to shoreside power – when this solution is offered in ports.

Read More Related Articles Babcock’s Plymouth base on standby to be involved in Aukus Australian nuke sub project Read More Related Articles Devon’s Appledore shipyard reactivated with arrival of £2m cargo vessel

https://www.business-live.co.uk
William TelfordBusiness Editor, Plymouth Live
Sector
Business